• Home

Commander Cd 750 Manual

 
  1. Jensen Cd-750 Manual
  2. Jensen Cd-750

View and Download Yamaha CDX-750 owner's manual online. Natural Sound CD Player. CDX-750 CD Player pdf manual download. Also for: Cdx-550. Details of these can be found on the CD supplied with the Commander SK. Acceleration rate. The serial interface are not stored in the drives EEPROM until a manual store is.

Jensen Cd-750 Manual

I n s t a l l a t i o n I n s t r u c t i o n s
PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION
www.powercommander.com
2191 Mendenhall Drive North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com
1
1
1
2
2
2
Cd-750
1
THE IGNITION MUST BE TURNED
THE LATEST POWER COMMANDER
DOWNLOADED FROM OUR WEB SITE AT:
Manual
2000-2001 Suzuki GSXR750 - PCV - 1

Advertisement

Related Manuals for Dynojet Power commander GSXR750

  • Motorcycle Accessories Dynojet Power Commander V Installation Instructions Manual
    Fuel and ignition; 2016 yamaha kodiak 700 (6 pages)
  • Motorcycle Accessories Dynojet Power Commander V Installation Instructions Manual
    For yamaha vector 2010; yamaha vector 2011 snowmobile motorcycle fuel injection tuning module (7 pages)
  • Motorcycle Accessories Dynojet Quickshifter Installation Manual
    2008-2012 yamaha r6; 2009-2012 yamaha r1 (3 pages)
  • Motorcycle Accessories Dynojet Power Commander FC Installation Instructions
    Fuel controller for yamaha zuma 125 2009; yamaha zuma 125 2010; yamaha zuma 125 2011; yamaha zuma 125 2012; yamaha zuma 125 2013; yamaha zuma 125 2014 (5 pages)
  • Motorcycle Accessories Dynojet Target Tune Installation And User Manual
    For dynojet power vision (9 pages)
  • Motorcycle Accessories Dynojet Autotune Basic Installation And Placement Instructions
    (2 pages)
  • Motorcycle Accessories DYNOJET POWER COMMANDER III Installation Instructions
    2003-2004 suzuki gsxr 1000 (3 pages)

Summary of Contents for Dynojet Power commander GSXR750

Jensen Cd-750

  • Page 1 Power Commander USB Cable Installation Guide 2000-2001 Suzuki GSXR750 Power Commander Decals Dynojet Decals I n s t a l l a t i o n I n s t r u c t i o n s Velcro strips Alcohol swab THE IGNITION MUST BE TURNED OFF BEFORE INSTALLATION!
  • Page 2 Crank- Do NOT connect anything to this port unless plug. instructed to do so by Dynojet. It is used to transfer crank trigger data from one module to NOTE: If you tin the wires with solder it will make another.
  • Page 3 FIG.A Remove the main seat and the passenger seat. Unbolt the front of the fuel tank and hold the front of it up, using the prop rod located in the tail section. Locate and unplug the pair of stock sub-harness connectors for the fuel injector rail (Fig. A). Unplug Note: This is a pair of BLACK 16-pin connectors, located directly below the fuel tank. FIG.B Plug the matching pair of connectors of the PCV harness in-line of the stock connectors (Fig. B). FIG.C Route the PCV wiring harness along the inside of the left frame rail towards the Ground wire battery. Secure the ground wire of the PCV harness to the negative (-) terminal of the bike’s battery (Fic. C). PCV harness 20-037 www.powercommander.com 2000-2001 Suzuki GSXR750 - PCV - 3...
  • Page 4 FIG.D Using the supplied Velcro, secure the PCV module in the tail section (Fig. D). Use the supplied alcohol swab to clean the surface area prior to applying the Velcro. Make sure all wiring is routed properly and also free and clear of any hot or moving parts. Lower and bolt down the front of the fuel tank. Note: When lowering the fuel tank, make sure the fuel line and PCV wiring harness do not get kinked or pinched at the frame support.